Krasavinskaya CHPP 64 MW
Technical audit (Due Diligence) with development of measures to improve efficiency
Country:
Russian Federation
Location:
Volgograd region
Customer:
Confidential
Period:
October 2012 - January 2013
During 2009-2012, a new combined-cycle gas and steam cogeneration plant with the use of European equipment with a total capacity of 64 MW was built in Krasavino, Vologda Oblast. A Russian investor considered the issue of entering the capital of this plant.
EF-TEK was engaged as a technical consultant to conduct a technical audit (Due Diligence).
Composition of services rendered:
- Expert assessment of the current condition of the facility.
- assessment of energy supply limitations
- assessment of risks for the investor caused by the quality of design and construction of the plant;
- development of proposals to improve the efficiency of the plant and to optimize costs.
- Forecasting of plant operations, operating costs for the period up to 2028, including:
- repair plans (current/capital) and costs;
- estimation of investment costs,
- plans for generation and output of electricity and heat energy;
- calculation of fuel costs.
- forecast of operating capacity on a monthly basis.