RusHydro Group is considering a project to build an energy bridge to Japan. EF-TEK was engaged by JSC TEK Mosenergo as the main executor of this project concept.
The scope of EF-TEK's services included:
- determination of the values of possible electricity and capacity exports, supply points (based on the analysis of power system balances);
- determination and substantiation of the required installed capacity of newly constructed TPPs with elaboration of equipment composition;
- development of possible variants of the scheme of power supply from the TPP to the border, an aggregated assessment of construction volumes and capital costs;
- determination of economically justified prices for electricity on the Russian side and on the Japanese side (taking into account transmission costs);
- evaluation of the project's economic efficiency (IRR, NPV, PBP, DPBP).