110 KV line entrances to the substation

Examination of compliance of construction and assembly works with design documentation

Country:

Russian Federation

Location:

Khanty-Mansiysk Autonomous District

Customer:

Premier-Energo, LLC

Period:

April - May 2016

The overhead line route is located in Nefteyugansk district of Khanty-Mansiysk Autonomous Okrug - Yugra, 36 km along the Nefteyugansk - Surgut highway.


The length of the 110kV overhead line route is 7.3 km.


Within the framework of the project were carried out:

  • Analysis of the location of the route and right-of-way for the passage of two double-circuit overhead line 110 kV.
  • It was found that the axis of the route and the actual location of 110 kV supports performed at the site corresponds to the design documentation.
  • The current state of 110 kV overhead line entrances to the 220 kV Vector substation was assessed, including determination of the overhead line route location, determination of the supports position using a set of GPS/GONASS Leica satellite signal receivers in the real-time kinematics mode, determination of the distance between the spans, visual inspection of the line fittings, grounding and types of structural elements of supports.