Construction of 220 KV power transmission line "Taman-Port"
Conducting the 4th stage of public technological and price audit of the investment project
Country:
Russian Federation
Location:
Krasnodar region
Customer:
Kubanenergo, PJSC
Period:
April - June 2019
Technological and price audit of the investment project for the fourth stage - commissioning of the facility as a result of IP implementation, which was the scope of work of EF-TEK LLC:
- analyzing the compliance of the operational mode of the facility and the equipment installed therein with the operational norms and rules, as well as the requirements of equipment suppliers;
- analyzing the IP from the point of view of compliance of actual indicators at the operation stage with the indicators laid down in the TOR for design;
- compliance of the completed project with the approved design documentation;
- verification of targeted spending of funds during construction, verification of compliance of the cost of completed works with contractual documentation, identification of budget deviations from the planned indicators;
- verification of compliance of performed works at the object with the requirements of the design and developed on its basis RD, technical regulations, results of engineering surveys;
- checking the estimate documentation prepared during the acceptance of the completed works for correctness of its preparation and compliance with the design (working) documentation;
- verification of compliance with energy efficiency regulations of the facility at the stage of construction completion in accordance with the requirements of the design documentation;
- analyzing the environmental efficiency of the facility in operational mode;
- issuance of recommendations by the Contractor, if necessary, to finalize the IP.